Service capability
Grid Stations & Substations
132kV / 220kV AIS & GIS. Turnkey EPC and ETC of high-voltage grid stations and substations, including primary plant, secondary systems, protection, control and civil infrastructure.
Scope of work
132kV / 220kV AIS & GIS.
Turnkey EPC and ETC of high-voltage grid stations and substations, including primary plant, secondary systems, protection, control and civil infrastructure.
- 132kV and 220kV AIS / GIS grid stations
- Switchyard and bay equipment installation
- Power transformers, switchgear and busbar systems
- Protection, control, metering and auxiliary systems
- Control buildings, equipment foundations and cable trenches
- Testing, commissioning and energisation support

Project lifecycle
Coordinated from engineering to handover.
Our delivery model connects technical design, procurement coordination, installation, testing and commissioning activities.
01
Engineering & planning
Scope review, design development, specifications, drawings, BOQs and interface coordination.
02
Procurement & execution
OEM coordination, supply packages, civil works, installation and construction management.
03
Testing & commissioning
Inspection, functional testing, commissioning support, documentation and handover.